Scope of Works

  • Technical Assistant to Main Consultant in preparing of Tender phase for one Joint Venture contractors (confidential): Quantity takeoff of the whole project’s civil structures, including 120km of viaducts and bridges.

The Mumbai–Ahmedabad High-Speed Rail Project (Package MAHSR-C-4) is part of India’s first bullet train corridor, spanning 508 km between Mumbai and Ahmedabad.

Package C-4 covers the design and construction of a 237 km viaduct, four stations (Vapi, Bilimora, Surat, and Bharuch), one depot, and a mountain tunnel.

Led by Larsen & Toubro, the project aims to reduce travel time to approximately 3 hours, with trains operating at speeds of up to 320 km/h.