PonTech

Scope of Works

As a sub-designer, Pontech participated in the preliminary design phase of the JKT MRT, including:

  • Structural design and optimization of typical prestressed concrete viaducts with U-shaped sections;
  • Design of associated bearings.
Share this post

10 +

Years of

Experience

PonTech