

This is the first gigafactory project and also the biggest Gigafactory in France.
Pontech team has carried out full execution studies (design calculation + shop drawings) for two buildings (hot water and cold-water treatment buildings) using precast Reinforced / Prestressed concrete structures. We also realize shop drawings for other main process buildings (including Mixing, Coating, Backing and Formation building). BIM procedure is applied for this project.